VERTICAL CONVEYING EQUIPMENT MANUFACTURER

Vertical Conveyors Built Around Your Material Flow

For cartons, totes and pallets—configured around your load, lifting height, layout and conveyor interfaces.

EQUIPMENT RANGE

Vertical Lifting Solutions for Your Material Flow

Different structures for different applications. Find the right vertical transfer solution for your load, layout and conveyor interfaces.

Fork-Arm Vertical Lift

Multi-level transfer with flexible loading and unloading positions.

Fork-Arm Vertical Lift

Fork-arm carriers move unit loads vertically and transfer them at selected levels. Suitable for projects with multiple conveyor interfaces or non-standard transfer positions.

Best for:

  • Multi-level transfer
  • Flexible interface layouts
  • Project-specific conveyor connections

Reciprocating Vertical Lift

Point-to-point vertical transfer between defined levels.
Reciprocating Vertical Lift

An enclosed lift platform moves loads between defined levels and connects with roller, belt or chain conveyors based on the project layout.

Best for:

  • Cartons, totes and unit loads
  • Defined floor connections
  • Conveyor system integration

Continuous Vertical Conveyor

Continuous vertical flow for high-frequency material handling.
Continuous Vertical Conveyor

Circulating carriers move unit loads between levels in a continuous loop, helping connect infeed and outfeed conveyors where steady material flow is required.

Best for:

  • Cartons and totes
  • Continuous material flow
  • Automated conveyor lines

Custom Vertical Lift

Configured around your load,  space and material flow.

Custom Vertical Lift

For projects with limited installation space, special transfer directions or non-standard equipment connections, the lift configuration can be developed around the actual material flow.

Best for:

  • Special layouts
  • Limited space
  • Custom transfer interfaces

SYSTEM INTEGRATION

Built to Connect With Your Material Flow

Our vertical lifting systems are configured to connect with your infeed and outfeed conveyors, AGVs or production equipment—based on your load, layout and transfer requirements.

Vertical Conveyors SYSTEM INTEGRATION

SELECTED PROJECTS

Projects & Applications

See how XDL LIFT vertical conveying systems are used in real material handling projects.
Each solution is designed based on the actual load, layout and production requirements.

Multi-Station Vertical Transfer for Reusable Totes2
Multi-Station Vertical Transfer for Reusable Totes

Multi-Station Vertical Transfer for Reusable Totes

This project shows a multi-station vertical transfer arrangement for reusable plastic totes within an industrial facility. Multiple fork-arm lift stations are positioned alongside the material-flow area to support vertical movement between work zones. The photos were recorded during on-site installation and commissioning.

Cargo Type
Reusable plastic totes containing small parts or components.

Application
Vertical transfer between internal work areas or levels where reusable totes need to move with the production flow.

Equipment Type
Multi-station fork-arm vertical lift system

Project Note
Lift height, load capacity, transfer speed, number of served levels and control logic are configured around the actual tote size, layout and process requirements.

Extendable Roller Conveyor for Carton Transfer and Container Loading
Extendable Roller Conveyor for Carton Transfer and Container Loading2

Extendable Roller Conveyor for Carton Transfer and Container Loading

This project documents carton handling with an extendable roller conveyor. The flexible conveyor creates a practical transfer path from the dock area into a shipping container, helping operators move cartons through the loading process. A second site photo shows cartons transferring through the same roller-conveyor format at an equipment interface.

Cargo Type
Cartons of packaged goods.

Application
Container loading and unloading, dock transfer, and carton movement at a process-equipment interface.

Equipment Type
Extendable roller conveyor.

Project Note
Conveyor length, roller specification, height adjustment, load range and interface details should be confirmed according to carton dimensions, dock conditions and operating process.

From Requirement to Solution

Tell us what you need. Our engineering team will help turn your project requirements into a practical vertical conveying solution.
01

Production Workshop

Multiple vertical conveyor assemblies and conveyor modules are arranged in the same workshop area, giving customers a direct view of the equipment build environment and transfer interfaces.

Production Workshop
Mechanical & Electrical Assembly
02

Mechanical & Electrical Assembly

Technicians assemble and connect components on a guarded vertical conveyor module. The photo records mechanical and electrical work being carried out directly on the equipment.

03

Equipment Review

The project team reviews the guarded lift section and roller-transfer interface before the next project stage. Visible items include the safety guard, lift structure and conveyor connection.

Equipment Review
Control Cabinet Assembly & Wiring
04

Control Cabinet Assembly & Wiring

This open control cabinet shows the HMI, operating buttons, status light, drives, circuit breakers, terminal blocks and internal wiring during control-system assembly.

05

Dispatch Preparation

Finished conveyor modules are wrapped and positioned on a truck for dispatch. The photo shows the protective film and tie-down straps used during loading preparation.

Dispatch Preparation
PROJECT COLLABORATION

A Clear Path From Requirement to Delivery

A practical six-step workflow for vertical conveying projects. Each stage confirms the information needed for the next decision.
01

Requirements

Share your load, layout, target throughput and available information.

You provide project inputs.

02

Application Review

We review material flow, transfer directions, space and interfaces.

We identify key constraints.

03

Solution Design

We develop the lift configuration and proposed conveyor connection.

We issue a project-specific proposal.

04

Confirmation

Together we confirm the agreed scope, interfaces and commercial details.

Both sides align before build.

05

Manufacturing

Equipment is manufactured and assembled against the confirmed project configuration.

We keep work aligned with the approved scope.

06

Testing & Delivery

We complete agreed checks and prepare equipment for dispatch and handover.

You receive delivery information for coordination.

SUPPORT FOR INTEGRATORS

Practical Project Support from Technical Review to Delivery Coordination

We work with system integrators on the technical details that keep a vertical conveying project moving: layout review, interface definition, custom configuration, manufacturing coordination and delivery preparation.
Vertical Conveyor Application Review

01 | Engineering Coordination

Share your project drawings, process information and target material flow. Our team reviews the information with you to identify the details needed for the lift solution.

02 | Dimension & Interface Review

We review infeed and outfeed elevations, transfer direction, available space and equipment interfaces before finalizing the configuration.

03 | Custom Configuration Support

Where standard layouts do not fit the project, we can discuss lift structure, carrier type, guarding and conveyor connections around the actual application.

04 | Manufacturing Progress Coordination

For confirmed projects, manufacturing-stage communication can be arranged around agreed milestones so your project team can coordinate the next interfaces and site preparation.

05 | Export Packing & Dispatch Preparation

We prepare equipment for dispatch based on the confirmed shipping plan, including packing arrangement and shipment information needed for coordination.

06 | Technical Documentation & Project Support

Project-specific drawings, equipment information and technical clarification can be provided according to the agreed project scope and delivery requirements.

FAQ FOR SYSTEM INTEGRATORS

Questions Before You Start a Vertical Conveying Project

The earlier we understand the material flow and interfaces, the faster we can discuss a practical solution.
What do you need for an initial review?

Share the load, dimensions, weight, lift height, target throughput, layout and existing conveyor information where available.

The choice depends on the load, transfer positions, required flow and space. We review these conditions before recommending a configuration.
We review the infeed and outfeed elevation, transfer direction, conveyor type and available interface space with your team.
Can the equipment be configured for a non-standard layout?
We can discuss the lift structure, carrier, guarding and conveyor connection around the actual application and site constraints.
The confirmed configuration becomes the reference for manufacturing coordination, agreed project updates and delivery preparation.
Confirm the agreed equipment scope, packing arrangement, delivery requirements and the site information needed for receiving and installation coordination.

Have a project in mind? Send the information you have now. Missing details can be confirmed during the application review.

PROJECT INFORMATION CHECKLIST

What to Prepare for a Faster Technical Review

You do not need every detail for the first conversation. The items below help us understand the application and identify the next questions.

Please share the information you already have. Any missing details can be clarified during the application review.

Vertical Conveyor Confirmation
01

Load Dimensions

Length × width × height of the product, carton, tote or pallet.

02

Load Weight

Weight per item or carrier, including the load support where relevant.

03

Lift Height

Vertical distance and the elevation of each required transfer point.

04

Throughput

Required units per hour or the expected transfer cycle.

05

Levels Served

Number of levels and the loading or unloading requirement at each level.

06

Conveyor Interfaces

Existing conveyor type, elevation, direction and available connection space.

07

Site Layout Drawing

Available floor plan, equipment arrangement, building dimensions or site photos.

Send Project Requirements

Contact & Visit Us

Get a Vertical Conveying Solution for Your Project